Coombe Wood School

Coombe Wood School

Infrastructure
THE BRIEF Robert West was appointed by Wates Construction Ltd to provide transport planning and highways advice for the redevelopment of the Coombe Lodge Playing Fields site in South Croydon to provide a new mixed comprehensive secondary school.The new 8-form entry secondary school will provide accommodation for up to 1,680 pupils, including a 480-place sixth form. The school will have a sporting specialism and will provide a community hub, offering sports and leisure facilities for residents of Croydon.Robert West have been responsible for producing the following, in support of the planning application: a Transport Assessment, School Travel Plan, Delivery and Servicing Plan, Car Park Management Plan, PERS and CERS audits, Bus and Tram capacity assessments. Robert West have also been responsible for producing preliminary designs for the proposed site’s access…
Leer más
Birkdale Rise

Birkdale Rise

Infrastructure
THE BRIEF To discharge engineering-related Reserved Matters and prepare detailed tender and construction drawing packs for a residential development of 100 units with 14 dwelling types ranging from one to five bedrooms on a 5.2-hectare greenfield site, which had outline planning permissionVALUE-ADDED SOLUTION We are providing on and off-site civil engineering design - highways, drainage, flood risk assessment, with a view to gaining Sectional Agreements (S106, S104, S38 and S278).As the project progressed, it became apparent that the proposed Highways England’s improvement works to the A12 affected the north of the site – as a result, the number of dwellings was reduced, and noise barriers were included in the scheme.Parking surveys were undertaken to assess whether vehicles arriving during construction could be accommodated without affecting the surrounding areas.  This was…
Leer más
Dartford GSK

Dartford GSK

Infrastructure
THE BRIEF Ward Homes were considering purchase of a large site in Dartford which had outline planning consent for 1,000 homes and a mix of uses for the new residential community. Robert West was asked to provide due diligence advice and a strategy to obtain Code for Sustainable Homes Level 4 and BREEAM excellent for the site as these were subject of reserved matters. Additionally, Robert West was asked to provide engineering advice in support of the master planning process for the site which was used to feed into the Ward Homes development appraisal.  VALUE-ADDED SOLUTION The two elements of the brief were brought together to bring clear focus to the engineering and environmental matters that Ward Homes required to be resolved with the vendor prior to exchange and in…
Leer más
HORSEFERRY MAGISTRATES COURT

HORSEFERRY MAGISTRATES COURT

Uncategorized
THE BRIEFRobert West provided civil and structural engineering services for a prestigious residential development in the heart of Central London. The scheme comprised deepening of the existing basement to accommodate automatic parking and servicing requirements and 140 residential units over 10 floors.VALUE-ADDED SOLUTIONRobert West carried out extensive investigations of the existing diaphragm walls, which were incorporated into the new works to establish penetration, condition and reinforcement layout. FINAL OUTCOMESA construction sequence was developed and AIP submissions agreed with Westminster City Council. The superstructure is a flat slab construction with stone cladding arranged around a central courtyard. The whole project was designed and drawn in 3D using BIM. Share BACK TO PROJECTS
Leer más
Land East of Billinghurst

Land East of Billinghurst

Infrastructure
THE BRIEF The design of primary infrastructure for a 450-unit residential development, including 1.1km of primary distribution road linking the A29 roundabout to a proposed roundabout on the A272 east of Billingshurst. Sustainable Urban Drainage Systems (SUDS) and foul drainage networks, and public open space were also incorporated into our design package. Robert West have responsibility for discharge of all reserved matters for the development and are responsible for obtaining technical approval for highway works as part of the Section 278 Agreement. All designs are required to be carried out in accordance with the outline planning consent for the development and associated Section 106 Agreement. VALUE-ADDED SOLUTION With the potential for a future linkage to a bypass road a two-stage highways design has been proposed by Robert West. The first…
Leer más
Ther Swan school

Ther Swan school

Uncategorized
THE BRIEF Our challenge was to provide the new secondary school with an access design and associated management strategy to enable all road users to operate in safe and efficient way. The proposed location for the school had several constraints to overcome.  These included: vehicular access to the school that cut through a strategic cycle lane in Oxford, which accommodated very high cycle flows of circa 500 cyclists per hour, and traffic speed of 40 mph along the major road from where access was gained. Furthermore, the area around the school has on-street parking congestion and on-site drop off was required – resulting in vehicles needing to turn across the busy cycle lane. VALUE-ADDED SOLUTION Undertaking access design, road safety audit and complex modelling exercises our team were able to…
Leer más
Kings Cross Square

Kings Cross Square

Infrastructure
THE BRIEF Robert West was approached to provide engineering support to an existing client contractor who was constructing this prestigious new public space.The contractor was seeking. through value engineering, to ensure that the project was quick, easy and cost effective to build.  Robert West redesigned substantial elements of the infrastructure, bringing a pragmatic and contractor-friendly approach to the project.VALUE-ADDED SOLUTION Robert West oversaw:the reconstruction of some elements of the existing London Underground structures under the square, the design of cladding support systems and major improvements to the drainage infrastructureConstruction support, providing proactive and swift response to any technical queries arising at siteFINAL OUTCOMES The determination of the project team to meet deadlines ensured that Robert West delivered to the client’s expectations, demonstrating our ability to think on our feet and…
Leer más
Worcester Warriors Sixways

Worcester Warriors Sixways

Infrastructure
THE BRIEF Following promotion to the Premiership, Worcester Warriors were required to increase capacity of their Sixways ground together with upgraded parking and access.  The Club also agreed to allow Worcester County Council to operate a park & ride facility from the sit on non-match days. VALUE-ADDED SOLUTION Services supplied included: Planning application including environmental statements Traffic modelling and assessments Flood modelling and risk assessments Outline design for 5,000 capacity new stand Detailed infrastructure design including utility diversions Contract administration and site supervision Our infrastructure scheme integrated the requirements of Worcester Warriors, WCC, an adjacent sports and leisure operator and Advantage West Midlands.  We secured permission for development of up to 20,000 stadium capacity within the green belt, and for diverting a water course to maximise land value.  Our proposed…
Leer más

ARMY NAVY FLYOVER CHELMSFORD

Uncategorized
THE BRIEFThe Army & Navy Flyover is a multi-span steel girder bridge with reinforced concrete deck which was built in 1976 to ease traffic flow across the roundabout below.  It derives its name from the Army & Navy department store which used to be located there.Following an inspection report which raised concerns requiring further investigation, the flyover was closed on 11 September 2018.  With this important public structure closed for urgent checks, Robert West, working under the instructions of Topbond Plc, responded rapidly to undertake a detailed condition inspection. VALUE-ADDED SOLUTIONThe inspections were undertaken during both night and day shifts under traffic management conditions utilising specialist equipment including a Mobile Elevated Working Platform (MEWP).Performance Condition Indicator Scoring (previously BCI scoring) was undertaken. This involved assigning a defect severity and extent score…
Leer más
Springhill Roundabout

Springhill Roundabout

Infrastructure
THE BRIEF Robert West Consulting was commissioned by Springhill Farms having previously worked successfully on their site, providing a reservoir for both irrigation and drainage purposes.On this occasion, the brief was to design and secure technical approvals for a new junction (three arm roundabout) on the A44 to provide access to a new development that comprises a five-hectare glasshouse and anaerobic digester facility. In addition, Robert West Consulting provided feasibility, transport planning, procurement advice and construction administration for the on-site works.VALUE-ADDED SOLUTION Practical constraints involved keeping the flow of the traffic on the A road moving by undertaking the construction off-line and in several phases; highway drainage issues resolved with the unusual solution of a private attenuation pond; and the disparity in levels between the A44 and the immediate site…
Leer más