Land East of Billinghurst
THE BRIEF The design of primary infrastructure for a 450-unit residential development, including 1.1km of primary distribution road linking the A29 roundabout to a proposed roundabout on the A272 east of Billingshurst. Sustainable Urban Drainage Systems (SUDS) and foul drainage networks, and public open space were also incorporated into our design package. Robert West have responsibility for discharge of all reserved matters for the development and are responsible for obtaining technical approval for highway works as part of the Section 278 Agreement. All designs are required to be carried out in accordance with the outline planning consent for the development and associated Section 106 Agreement. VALUE-ADDED SOLUTION With the potential for a future linkage to a bypass road a two-stage highways design has been proposed by Robert West. The first…