Projects
THE BRIEF RWC were engaged by Saipem to undertake marine and shoreside civil engineering services…
THE BRIEF Project Acorn will receive and treat captured carbon dioxide recovered from industrial activity…
THE BRIEF Robert West Consulting (RWC) was appointed by Stolthaven Terminals to provide design services…
THE BRIEF Robert West was appointed by the joint venture of Ferrovial Agroman Laing O’Rourke…
THE BRIEF Flo JV appointed BAM Nuttall Ltd (BAMN) to design and construct a Temporary…
THE BRIEF Flo JV appointed BAM Nuttall Ltd (BNL) to design and construct the marine…
THE BRIEF As part of the Woolwich Ferry replacement project, a detailed survey of the…
THE BRIEF Robert West was appointed to provide the detail design of a temporary cofferdam…
THE BRIEF The joint venture of Ferrovial Agroman and Laing O’Rourke that is building the…
THE BRIEF Robert West Consulting were commissioned by Mclaughlin and Harvey to prepare tender stage…
THE BRIEF In August 2021 Portland Port invited tenders for the design and build of…
THE BRIEF Seacon needed to increase the capacity and strength of the approach structure to…
THE BRIEF The Riverlinx Joint Venture was required to construct a new river wall along…
THE BRIEF Love solving problems? This was a fascinating challenge for the team at Robert…
THE BRIEF The Aberdeen Harbour Expansion Project involves the development of a new harbour in…